Client:

Yay Lunch

CHALLENGE

Yay Lunch! was taxed with an inefficient code base. They had difficulty implementing changes and struggled to meet the scaling requirements necessary for their business needs. Without scalability, Yay Lunch could not achieve its mission of making healthy lunches accessible for every child.

Solutions

Midwestern took ownership of the legacy code, accelerated it, and made the necessary improvements. We refactored and improved the overall health of the code base. These improvements allowed them to increase their number of drivers and scale their business with less overhead administration and fewer bugs. The result was thousands of hours saved. We mastered their business logic and rewrote their slowest endpoints, reducing database queries by 40 times and making the system 50 times faster.

DESIGN ROLES

Support Roles

Scrum Certified Project Management

engineering Roles

Software Engineer
case studies image
quotes

The Midwestern Crew is doing an awesome job. I’m constantly impressed by everyone. They take nitpicky corrections and small details very seriously.

Seth Atwood | Yay Lunch!

4

Main Features Shipped

1000

hrs

Manpower Saved

50

x

Faster Load Times